Clear unwanted loose furniture before renovation work starts, move retained belongings out of the work area and put renovation debris removal in your contractor's scope. Set the sequence room by room with the contractor, then book the furniture collection. Bulky Buddy handles the agreed furniture and household items; we do not take renovation debris.
The useful deadline is when the room must be ready for work, not simply “reno starts Monday”. A sofa beside the wall due for hacking and a fridge you intend to keep need different instructions. Settle those instructions while the flat is still easy to walk through.
Already have the list? Send the photos and access details for your fixed price.
Get my collection priceWalk the rooms with the contractor
Take the contractor's work schedule and mark the rooms it affects first. For each room, decide what goes, what stays and what needs another trade to disconnect or release it. Get the decisions into one written list with photos.
In a resale HDB flat, that could mean clearing the living-room sofa and loose cabinets before flooring work. In a terrace house, it may mean bringing retained bedroom furniture downstairs with a separate mover before the staircase becomes a work route. At a condo, the service-lift slot needs to fit the collection date.
Our house clearance guide covers the broader full-home job. Here the priority is the handover between disposal and renovation: an empty work area, a protected route and no confusion about which crew takes which material.
Give each item a destination and an owner
Use four categories instead of one enormous “clear everything” instruction. A disposal crew should not have to guess whether the solid-wood dining table under a sheet is unwanted or being saved for the finished flat.
| Category | What happens next |
|---|---|
| Furniture to dispose of | Photograph and list it for collection, including the dismantling it needs. |
| Belongings to keep | Pack separately and arrange storage or a protected location with the contractor. |
| Items to sell or donate | Settle the recipient and transport; remove them from the disposal list. |
| Contractor's strip-out | List built-ins, fixed fittings and the debris generated by the renovation in the works scope. |
Add a person responsible beside each category. “The contractor will sort it” is too vague when the contractor thinks you booked someone else. The table can be a phone note; it does not need to become another renovation spreadsheet with twelve tabs.
Loose furniture, fixed fittings and built-in carpentry
A free-standing chest of drawers is a furniture item. A built-in wardrobe attached to the room needs a specific removal plan. A basin, wired light or plumbed appliance also needs the relevant disconnection work, not just enough people to lift it.
Our wardrobe service includes assessed built-in wardrobe removal. If you want that as a separate furniture job, show us the installation and have it included explicitly in the quote. Do not book the same removal twice with the renovation contractor.
For the wider strip-out, put fitted kitchen carpentry, wall-hung units, brackets and fixed fittings into the contractor's written scope. Have the contractor identify the trades needed to release them safely. We are not promising general hacking, electrical work, plumbing or repairs to the wall left behind.
If you are unsure whether a unit is built in, photograph its top, sides and wall connection. The distinction matters more than what the original sales invoice called it. Do not pull it away from the wall to investigate.
Keep renovation debris with the renovation job
Hacked tiles, cement, off-cuts and carpentry ripped out during the works are renovation debris. We do not collect that material. Your contractor normally handles its cart-away; write the responsibility into the renovation scope, including when it leaves and who arranges the disposal route.
Keep the pre-renovation furniture load separate from debris created later. If hacking has already started, send current photos so the distinction is clear. Putting broken tiles in black bags does not turn them into ordinary household clutter.
We can collect bagged general household junk alongside the furniture. Empty the cupboards first and keep only ordinary unwanted household contents in those bags. Leave the contractor's work materials and waste out of that pile.
Give the things staying a real plan
A sheet over a sofa is not a storage arrangement. Decide with the contractor whether anything can remain in the flat, where it will sit and who will move it as work progresses. If the work affects every room, arrange off-site storage and the transport separately.
We provide disposal, not house moving or storage. Send the mover a keep-list and send us the disposal list. Our removal versus disposal guide explains that split if both jobs need coordinating.
Pack documents, jewellery, keys and daily essentials away from the collection. Take condition photos of furniture staying and the doorway, floor and lift route. These give everyone the same starting reference when several trades will use the space.
Show us the full load, your floor and lift access. We quote the agreed collection together.
Get my collection priceFit clearance around the actual renovation approvals
HDB says some renovation works require a permit and others do not, and flat owners must use contractors from its Directory of Renovation Contractors for renovation works. Have your contractor establish what applies to the planned works.
Put permit checks, neighbour-notice arrangements and the start date on the contractor's schedule. Do not use a furniture pickup booking as proof that renovation work is cleared to begin. Check the current HDB requirements for your work rather than borrowing a neighbour's old renovation timetable.
Once the start sequence is settled, choose a disposal window that leaves room for a final walk-through. A collection ending at the exact moment the hacking crew arrives gives you no space to deal with an overlooked cabinet or a retained appliance still in the way.
Protect the route on collection day
Sort out floor and doorway protection with the people doing the work. Keep protection secure and the path clear of loose tools, packaging and trailing cables. A clear HDB corridor should stay clear while items pass through it, not become the sorting area.
For a condo, use our management and service-lift checklist to establish the building's route, lift protection and collection window. Show the crew the approved loading area. Tell them about stairs or a long carry when sending the initial quote photos.
Have one person walk the agreed list with the crew, pointing out anything that must stay. Once the furniture is out, photograph the cleared rooms and tell the contractor what is ready. Check behind doors and in the room corners; that last narrow shelf has a talent for surviving every clearout.
Send the furniture brief once
Send room photos, the final disposal list, your floor and lift access, any dismantling, and the date the contractor needs the space. We give a fixed, all-in quote for the agreed furniture collection. Separate scope, clear rooms, a sensible sequence: that is how you get the renovation started without two crews arguing over one cupboard.